|

Initially, GCC plant had been designed for a clinker production capacity of 3300 tons per day 1 million tons per year.
Subsequently, as a result of the modification programme, the production output of the clinker has been successfully increased to 4100 tons per day 1.3 million tons yearly - the first production line.
Also In 2005 GCC signed a contract to have second production line of clinker with a capacity of 7500 tons/day.
The total GCC capabilities:
- Clinker Production - 11600 tons/day
- Cement Grinding - 2.7 million tons/year
- Clinker Storage - 130,000 tons
- Cement Storage - 70,000 tons
- Loaders - 2400 bag/hour
- Power Generation - 27.25 MW
- Coal Grinding - 28 tons/h
GCC is a Multi-fuel system.
|