home
|
||||||||||||
|
|
||||||||||||
|
||||||||||||
|
In 1981, UBE Industries Ltd. Japan had completed the erection and commissioning of the following: · Two raw mills. · Four blending silos. · Two clinker silos with a total capacity of 20,000 tons (In 2002, GCC installed dome silo to upgrade clinker storage capacity to 130,000 tons). · Four cement silos with a total capacity of 40,000 tons (In 2000,2002, GCC installed 7 more silos to upgrade cement storage to 70,000). · Two raw meal storage silos. · Four stage pre-heater with one Inline Calciner. · One rotary kiln (4100 t/d) 1.3 million tons yearly. · One air quenching grate cooler. · Two cement mills ( In 1998 one mill added by CEMAG, In 2004 second mill added by CEMTEC) with Total capacity of 2.7 million tons per year. · Six diesel engines with 30 MW (In 1994 GCC commissioned a new Gas Turbine with rated output of 27.25 MW) · In 1992 (Rotary Packer along with auto and semi auto loaders with 2400 bag per hour).
Continual technical developments since 1981 of production line no1 ... In 2005, A new clinker production line with a capacity of 7500 t/d will be installed by ThyssenKrupp India and Polysius AG/ Germany to be commissioned with the following: · One vertical Roller mill type for raw meal grinding(600 t/h). · One blending storage silo of 20000 m3. · One bag house for dedusting (raw mill and kiln). · One pre-heater and calciner system with 5 stages and 2 strings. · One rotary kiln of 78 m with design capacity 7500 t/d. · One grate cooler with 2 stages. · One clinker bag house for dedusting 1.5 million m3 / h. |
|
|||||||||||
|
||||||||||||